Loft Kings logo
    07516 127767Get Free Quote
    Our Work

    500+ lofts later —
    here's what proper work looks like.

    Real projects from real homes across Solihull and Warwickshire. Each case below shows the starting condition, what we installed, and the measurable outcome the customer ended up with.

    Real Photo Gallery

    Genuine on-site photographs from completed lofts.

    Every image below is a real Loft Kings install — no stock photos, no AI. Filter by service to see exactly what each job looks like in a customer's home.

    Boarded loft floor with chipboard panels fitted between trusses, Solihull
    Loft Boarding
    P5 moisture-resistant chipboard loft boards laid over raised system, West Midlands
    Loft Boarding
    Fully boarded loft floor with hatch and chimney breast, professional install
    Loft Boarding
    Wide boarded loft storage floor between trusses, Loft Kings install
    Loft Boarding
    Loft boarding around chimney breast with clean cuts, Solihull project
    Loft Boarding
    Clean finished loft boarding against original brick gable wall
    Loft Boarding
    Boarded loft floor neatly cut around soil vent pipe
    Loft Boarding
    Spacious finished loft boarding install across full attic floor
    Loft Boarding
    New loft hatch opening cut into landing ceiling ready for install
    Ladders & Hatches
    Wooden loft ladder fully extended into hallway, Solihull home
    Ladders & Hatches
    Timber-framed loft hatch surround with concertina ladder fitted
    Ladders & Hatches
    Wooden folding loft ladder lowered through new boarded hatch
    Ladders & Hatches
    Insulated white loft hatch closed flush to landing ceiling
    Ladders & Hatches
    Three-section wooden loft ladder fully extended, safe install
    Ladders & Hatches
    Reflective foil insulation lining fitted across full roof slope
    Foil Lining
    Foil loft lining around water tank with boarded floor below
    Foil Lining
    Multi-layer foil insulation lining with finished boarded floor
    Foil Lining
    Boarded loft walkway lit by fluorescent strip lighting
    Loft Lighting
    LED strip lighting across boarded loft for safe access
    Loft Lighting
    Bare loft trusses prior to clearance and boarding works
    Clearance
    Boarded loft with new hatch opening cut into landing ceiling, Solihull
    Loft Boarding
    P5 chipboard loft boarding fitted neatly between trusses
    Loft Boarding
    Fully boarded loft floor with central walkway, Loft Kings install
    Loft Boarding
    Loft boarding install over original timber joists, West Midlands
    Loft Boarding
    Boarded loft with clean cut around hatch and bracing timbers
    Loft Boarding
    Wide-angle loft boarding completed across full attic floor
    Loft Boarding
    Loft boards laid over original mineral wool insulation
    Loft Boarding
    Boarded storage area with adjacent original insulation
    Loft Boarding
    Section of finished loft boarding with structural bracing visible
    Loft Boarding
    Newly fitted insulated white loft hatch flush to landing ceiling
    Ladders & Hatches
    Loft boarding completed with clean cut around chimney pipe
    Loft Boarding
    Tongue-and-groove loft boards installed across main attic span
    Loft Boarding
    Loft boarding install in Edwardian semi, Sutton Coldfield
    Loft Boarding
    Finished loft boarding with neat perimeter cuts to eaves
    Loft Boarding
    Boarded loft floor with hatch and ladder access fitted
    Loft Boarding
    P5 moisture-resistant chipboard loft boards laid over joists
    Loft Boarding
    Loft boarding around water tank with safe access path
    Loft Boarding
    Spacious finished loft floor — full boarding install
    Loft Boarding
    Boarded loft with hatch open showing landing chandelier below
    Loft Boarding
    Wide loft boarding install, raised over deep insulation
    Loft Boarding
    Loft boarding job completed across new-build trusses
    Loft Boarding
    Long boarded walkway through trussed roof loft
    Loft Boarding
    Loft boards installed neatly around vertical bracing
    Loft Boarding
    Loft boarding around pipework with clean access cuts
    Loft Boarding
    Section of loft boarding completed in Solihull home
    Loft Boarding
    Loft boards laid over raised sub-frame system
    Raised Boarding
    Raised boarding system installed above 270mm insulation
    Raised Boarding
    Boarded loft floor with chimney breast cut-out
    Loft Boarding
    Long central walkway boarded through new-build trussed roof
    Loft Boarding
    Boarded loft storage section, professional install
    Loft Boarding
    Loft boarding around vertical bracing in trussed roof
    Loft Boarding
    Boarded loft floor with clear walkway, Solihull
    Loft Boarding
    Finished P5 loft boards across full attic
    Loft Boarding
    Loft boarding completed with neat hatch cut
    Loft Boarding
    Wide loft boarding install with original gable wall visible
    Loft Boarding
    Boarded loft floor across full attic span
    Loft Boarding
    Loft boarding fitted around joists and bracing
    Loft Boarding
    Section of loft boarding with clean perimeter detail
    Loft Boarding
    Boarded loft floor across original timber joists
    Loft Boarding
    Boarded loft floor with bracing timbers, Solihull install
    Loft Boarding
    Boarded loft with new hatch opening cut neatly into ceiling
    Ladders & Hatches
    Loft prior to boarding showing original mineral wool insulation
    Clearance
    Original loft insulation in place before clearance and re-board
    Clearance
    Boarded loft floor through trussed roof, central walkway, Solihull
    Loft Boarding
    P5 chipboard loft boards laid through new-build roof trusses
    Loft Boarding
    Boarded loft walkway between trusses, professional install
    Loft Boarding
    Loft boarding completed across attic floor, West Midlands
    Loft Boarding
    Loft boarding finished beneath foil-membrane lined roof slope
    Foil Lining
    Loft boards installed across full attic with bracing
    Loft Boarding
    Boarded loft floor with neat perimeter cuts, Solihull project
    Loft Boarding
    Loft boarding completed with central walkway and storage zone
    Loft Boarding
    Boarded loft floor in trussed roof, full coverage install
    Loft Boarding
    Loft boarding install with hatch cut neatly into floor
    Loft Boarding
    Foil bubble insulation lining over rafters with boarded floor
    Foil Lining
    Loft boards finished beneath reflective foil lining
    Foil Lining
    Loft boarding completed with clean cuts around bracing
    Loft Boarding
    Boarded loft floor with central walkway through trusses
    Loft Boarding
    Foil membrane loft lining with strip light over boarded floor
    Foil Lining
    On-Site Videos

    Walkthroughs from real Loft Kings installs.

    Short on-site videos taken straight after completion — exactly how the loft looks when we hand it back.

    Explore the work

    Browse the services behind these projects.

    Project Case Studies

    Recent loft projects, start to finish.

    Project 01

    Full Loft Boarding + 270mm Insulation Top-Up

    Location: Solihull, B91 — 1970s detached
    Duration: 2 days
    Before

    Original 100mm insulation laid badly between joists, exposed timber walkway down the centre, no usable storage. Heat loss measurable from upstairs landing — radiators ran constantly to compensate.

    After

    Raised sub-frame installed across full loft area, 270mm mineral wool topped beneath, 18mm structural-grade chipboard floor with central walkway. Customer reported a 19% drop in winter gas usage by month two.

    Outcome

    32m² of usable, fully insulated storage. Heat retention restored to current Building Regs standard.

    Project 02

    Insulated Loft Hatch + Aluminium Ladder Replacement

    Location: Sutton Coldfield, B73 — Edwardian semi
    Duration: Half day
    Before

    Original push-up plywood hatch with no seal, leaking heat directly into the loft. Old timber ladder rotting at the base, unsafe to climb with anything in hand.

    After

    Fire-rated insulated hatch with full perimeter draught seal, plus a sturdy 3-section aluminium ladder rated to 150kg. Whole job completed before lunch with zero plaster damage.

    Outcome

    Compliant, draught-proof access. Landing now noticeably warmer in winter.

    Project 03

    Foil Loft Lining + Eaves Ventilation

    Location: Shirley, B90 — 1990s detached
    Duration: 1 day
    Before

    Persistent winter condensation on chipboard floor and underside of roof felt. Black mould forming on rafters, musty smell when hatch was opened.

    After

    Reflective foil lining fixed across full rafter span, blocked eaves cleared and over-fascia vents installed at low and high level to create proper cross-flow ventilation.

    Outcome

    Loft now bone dry through two winters. No condensation, no mould, no musty smell.

    Project 04

    Bespoke Loft Storage System with LED Lighting

    Location: Dorridge, B93 — Victorian terrace
    Duration: 1.5 days
    Before

    Awkward shallow loft with limited headroom, no light, no flooring, customer storing boxes on a single sheet of plywood balanced on joists.

    After

    Custom-zoned storage with shelving along the eaves, partitioned Christmas-decoration area, and 4 LED panels wired to a switch at the hatch. Walkway boarded with marine-grade chipboard.

    Outcome

    Loft transformed from unusable to fully functional storage zone — customer recovered an entire spare bedroom previously used for boxes.

    Project 05

    Full Loft Clearance + Re-Insulation

    Location: Bromsgrove, B61 — Inherited 1960s bungalow
    Duration: 2 days
    Before

    Loft full of 40 years of accumulated belongings, original 50mm insulation flattened and contaminated, no usable space whatsoever.

    After

    Full clearance with sorted disposal (recycled, charity, refused), original insulation removed and replaced with 300mm mineral wool, raised boarding installed across half the loft area.

    Outcome

    Clean, insulated, usable loft. Disposal handled with proper waste-carrier documentation.

    Project 06

    Raised Boarding Over Existing Deep Insulation

    Location: Stratford-upon-Avon, CV37 — New-build (2019)
    Duration: 1 day
    Before

    Existing 270mm insulation correctly installed by builder, but no usable floor — boards laid directly would have crushed insulation and reduced thermal performance by up to 50%.

    After

    Raised legs installed at structural points, 22mm tongue-and-groove boards laid over the top. Insulation remained at full design depth, fully ventilated underneath.

    Outcome

    30m² of structural storage with zero loss of thermal performance. EPC-rating preserved.

    Your Loft Next

    Get a fixed-price quote for your loft.

    Free in-loft survey. Photographs taken. Written quote in your inbox the same evening. No upselling, no follow-up calls.

    Call Now Free Quote